WeAlu stainless workshop
Workshop weld, laminated glass in Tangier
The WeAlu workshop cuts, welds and installs stainless in Tangier — 304 indoors, 316 on the sea front, laminated stair glass, 3D letters for signs. The quote carries a written install date.
- 304 indoors / 316 coast
- Glass + stainless stair
- Brushed or mirror
WeAlu workshop · Stainless & glass
Stainless workshop in Tangier
In Tangier the WeAlu workshop makes the stainless parts in-house : tubes, flats, clamps, then pairs them with laminated glass on site. Not an imported catalogue — a survey, a weld, an install.
Villa stairs (stringer + glass infill), lobby handrails, façade 3D logos, doors and claddings : survey, cut, TIG weld, brushed or polished finish, then anchoring. Sheltered interior or salt balcony — we pick the grade before we cut.
304 stock for pieces out of the spray; 316 as soon as marine air hits (Malabata, Cap Spartel, Cabo Negro). We work Greater Tangier, Tétouan, Asilah, Martil, M'diq, Larache.
A stair or balcony to dress in workshop stainless in Tangier? Call now — +212 660-130-030
They have their stainless welded in the shop
Villas, hotels and HQs across Greater Tangier — TFZ, TAC, Tech Zone, Tanger Med — send stainless and glass through the WeAlu workshop.
What the shop welds
Four stainless WeAlu jobs
Four families out of the workshop — survey, TIG, glass and install in Tangier.
-
Stainless railings
Clamps, standoffs or posts + laminated glass — balconies and terraces, 316 as soon as salt hits.
-
Handrails
Round or square tubes for stairs and walkways — brushed (fewer marks) or mirror polish.
-
3D stainless logos
Volume letters cut and folded in the shop — shopfront, lobby, sign.
-
Shop weld
Cutting, TIG, satin or polish, dry-fit in the shop before install day.
Villa & commercial jobs
Workshop stainless in Tangier
Three jobs the WeAlu workshop delivers most — stair, balcony, sign.
-
Stainless & glass railings
Laminated infill held by clamps, standoffs or welded posts. Open view to sea or patio — we size the glass to the drop and anchor into slab or concrete.
Ideal for Malabata balconies, hotel terraces, roof decks.
-
Glass + stainless stair
Stainless stringer or carriage, glass treads or infill, a continuous handrail. The shop dry-fits to the stair survey, then installs without leaving the landing unusable for days.
Ideal for Villa stairs, lobbies and mezzanines.
-
3D stainless logos
Letters cut, folded, sometimes back-lit. Brushed or mirror; on a marine façade we start in 316 and plan for salt care.
Ideal for Shops, TFZ HQs, hotel lobbies in Tangier.
Grades & glass
What the shop picks before cutting
Before a tube is cut, WeAlu chooses 304 or 316 by exposure, then PVB laminate by fall height.
- 304 / 316
Stainless steel
- Brushed
- Mirror
304 for dry halls; 316 (molybdenum) as soon as salt spray reaches the work — see also <a href="https://www.worldstainless.org/" target="_blank" rel="external noopener noreferrer">World Stainless</a>.
- PVB laminate
Stair glass
- Clear
- Low-iron
Thickness follows guard height and use: a villa stair is not a walkway rail. Light stays, shards stay in the interlayer.
Anchors matched to the support (concrete, steel, aluminium), TIG beads dressed, the site left usable. Indoors and outdoors in Tangier.
WeAlu workshop · Tangier
Stainless welded in-house
The WeAlu workshop designs and welds the parts, then fits the glass — stairs, balconies, 3D letters — villas and small buildings in Tangier.
-
Survey & weld
Stair or balcony survey, shop machining, install — nothing is cut on a guess.
-
Glass + stainless
Stair, rail, door and partition: laminate and metal share one layout.
-
Salt & care
316 on a sea façade; 304 under cover. Brushed if you want fewer fingerprints.
-
Date on the quote
Written install date after drawings are signed — one contact from shop to site.
Villa architects in Tangier
Villa stairs go through the WeAlu workshop
An architect sends the stringer and guard height : we send back a glass + stainless layout, dry-fit in the shop, install on the agreed day.
-
Stair survey
Going, rise, nosing, anchors — the stringer is not cut until those sizes are in.
-
Shop dry-fit
Trial assembly, bead dressing, satin or polish, then careful transport.
-
Finish chosen
Brushed (daily use, fewer marks) or mirror (show finish, more care) — we say so before polishing.
FAQ — Workshop stainless Tangier
Site questions about WeAlu stainless in Tangier.
304 versus 316 on the coast, a glass + stainless stair, polish versus brushed: what the shop answers before cutting.
-
304 or 316 stainless for a sea-facing balcony in Tangier?
As soon as the work sees salt spray (Malabata, Cap Spartel, the Marina, Cabo Negro), the WeAlu workshop starts in 316 : molybdenum holds chloride better than 304. A 304 sea façade pits sooner, even if well brushed.
304 still belongs in a dry hall or indoor stair. We pick the grade at the survey — not after the first rust bloom. World Stainless guidance points the same way.
-
How is a glass + stainless stair built in the workshop?
Typically : a stainless structure (stringer, carriage or posts), laminated glass infill or treads, a continuous handrail. The shop dry-fits to the stair survey, sets guard heights, then fits the glass once the metal is anchored.
The glass is not decoration : thickness and PVB follow the fall height. We do not reuse a mezzanine rail spec on a villa stringer without recalculating.
-
Mirror polish or brushed — which shows fingerprints more?
Mirror polish shows every mark — an entry handrail, children, salt on fingers after the beach. Satin brush breaks the reflection and hides prints better; that is what the shop recommends for daily use.
Mirror still looks right on 3D letters or a detail you rarely touch. You can mix : brushed rail, mirror logo. A microfibre cloth and a stainless cleaner are enough; on 316 by the sea, an occasional fresh-water rinse stops the salt film.
-
Will a 3D stainless logo hold on a marine façade?
Yes, if the letter is 316, the fixings too, and the back is ventilated (not a salt trap). The shop cuts, folds and sometimes back-lights — the LED cable runs in the fascia, not across the render.
Polished 304 on a seafront sign will haze. We put that on the quote rather than discovering it in the windy season.
-
What workshop lead time for a custom stair rail?
After survey and layout sign-off, allow about three to six weeks depending on shop load, grade (316 can take longer to source) and laminated glass. The install date is written on the quote — we do not promise “next week” without stock.
A quote can start from photos + sizes, or after a visit. Price by the metre or by the piece, glass and anchors included depending on the job.
-
Do you only install in Tangier, or as far as Cabo Negro?
Stainless leaves the WeAlu workshop in Tangier and is installed across Greater Tangier, Tétouan, Asilah, Martil, M'diq, Cabo Negro, Larache. A job farther out is discussed after drawings.
Aluminium/glass rails, ACM cladding : see also glass railings, Alucobond and WeAlu aluminium.
Workshop stainless Tangier